Nalley Valley

This project entailed thoughtful engineering and precise execution. Concrete singular columns and tetra pods supported the elevated high-strength roadway. The height and span of the structure required careful consideration and removal techniques to prevent an unstable situation. Rhineā€™s high-reach excavators allowed for a timely and conventional demolition without incident.

What We Did

  • Demolished designated portions of Highway 16 including on/off ramps
  • Removed extraordinarily large concrete footings
  • Coordinated with other trades on-site
  • Met extensive schedule requirements
  • Achieved a 100% recycle rate